total cost of ownership|total cost of ownership in English

TCO, total amount of money required to own and maintain something

Use "total cost of ownership|total cost of ownership" in a sentence

Below are sample sentences containing the word "total cost of ownership|total cost of ownership" from the English Dictionary. We can refer to these sentence patterns for sentences in case of finding sample sentences with the word "total cost of ownership|total cost of ownership", or refer to the context using the word "total cost of ownership|total cost of ownership" in the English Dictionary.

1. 'Total Cost of ownership' is the purchase price of an asset plus the Costs of operation, representing the complete Cost through its entire lifecycle.

2. The original cost is sometimes not the only cost of ownership .

3. Dodge has manufactured Couplings for over 100 years and has earned a reputation for developing innovative products that lower customers’ total cost of ownership

4. Now, all this private ownership of course had a public cost.

5. Insurance is an Ancillary cost associated with vehicle ownership.

6. These Architectures offer strong compatibility and reduce the cost of ownership of software

7. Average cost per action (CPA) is calculated by dividing the total cost of conversions by the total number of conversions.

8. WAAC cost of total capital after tax

9. Lon run total cost curve

10. Add together the total cost of the goods.

11. “Actual Project Cost” would be replaced by “Total Project Cost”.

12. Cost per Unit: quickly solve unit cost and total pricing .

13. NSERC, EPCOR, AERI, U of A (total cost of

14. Please figure out the total cost.

15. Total construction cost (mill.euro) (MP/actual)

16. Their accountant calculated the total cost of the project.

17. Own-account production = GFCF + disposals (slaughterings and exports) — acquisitions (imports) ( 35 ) — (cost of transfer of ownership).

18. That will cost you 50 in total.

19. The total cost comes out at 500.

20. What does Criticality Level mean? Criticality level is directly proportional to certain factors and criteria, including required total cost of ownership (TCO), overall operations and enterprise and system downtime and behavior

21. The total cost will approximate £15 billion.

22. Does the total price of all equipments include engineering cost?

23. This makes the total cost of the bulb and energy £

24. Optimum allocation of sampling resources is obtained by minimizing the product of total cost and total variance.

25. Mao's first goal was a total overhaul of the land ownership system, and extensive land reforms.